APPLICATION DOCUMENTS AND PLANS
Application Form
CD 1.1
(A) Application Form, including Ownership Certificates, dated 29th March 2023 – Chelmsford City Council
CD 1.2
(A) Covering letter to Chelmsford City Council, dated 29th March 2023
(B) Covering letter to Rochford District Council, dated 29th March 2023
CD 1.3 Community Infrastructure LVEY (CIL) – Form 1: CIL Additional Information, dated 29th March 2023
Application Drawings
CD 1.4 Site Location Plan:
CD 1.5 Existing Site Plan:
CD 1.6 Proposed Site Plan RC3-02-P02 Rev04
CD 1.7 PV ElevationsRC3-02-P03
CD 1.8 Inverter Transformer Stations RC3-02-P04
CD 1.9 Internal Access Road Details RC3-02-P05
CD 1.10 Fence and Gate Elevations RC3-02-P06
CD 1.11 Weather Station Detail RC3-02-P07
CD 1.12 Substation Elevations RC3-02-P08
CD 1.13 Control Room Elevations RC3-02-P09
CD 1.14 Auxiliary Transformer RC3-02-P10
CD 1.15 CCTV Elevations RC3-02-P11
CD 1.16 Battery Container Elevations RC3-02-P12
CD 1.17 Storage Container Elevations RC3-02-P13
CD 1.18 Battery Fence and Gate Elevations RC3-02-P14
CD 1.19 Detailed Landscape Design P22-1918_EN003E
CD 1.20 Illustrative Cross Sections:
CD 1.21 Proposed Temporary Signage Locations for Construction Traffic SK02
CD 1.22 Proposed Site Access Arrangement on A132 at Existing Field Access SK03
CD 1.23 Proposed Site Access Arrangement on A132 at Existing Field Access SK04
Application Documents
CD 1.24 Agricultural Land Classification Report, prepared by Amet, dated October 2022
CD 1.25 Arboricultural Impact Assessment, prepared by Barton Hyett, dated October 2022
CD 1.26 Biodiversity Net Gain (BNG) Calculator, dated October 2022
CD 1.27 Construction Traffic Management Plan, prepared by TPA, dated October 2022
CD 1.28 Design and Access Statement, prepared by Enso Energy, dated February 2023
CD 1.29 Designer’s Response to Stage 1 Road Safety Audit, prepared by TPA
CD 1.30 Ecological Appraisal Report, prepared by Avian, dated October 2022
CD 1.31 Flood Risk Assessment and Outline Drainage Strategy, prepared by WHS, dated October 2022
CD 1.32 Flood Risk Assessment Addendum: Technical Note, prepared by WHS, dated 23rd June 2023
CD 1.33 Glint and Glare Assessment, prepared by Neo Environmental Ltd, dated October 2022
CD 1.34 Heritage Statement (inc. Geophysical Survey Report), prepared by Savills, dated November 2022
CD 1.35 Landscape and Visual Impact Assessment, prepared by Pegasus Group, dated October 2022
CD 1.36 Noise Impact Assessment, prepared by Inacoustic, dated October 2022
CD 1.37 Outline Skylark Mitigation Strategy, prepared by Enso Energy, dated August 2023
CD 1.38 Planning Statement, prepared by Enso Energy, dated March 2023
CD 1.39 Report to Inform a Habitats Regulation Assessment, prepared by Avian, dated 27th June 2023
CD 1.40 Road Safety Audit Stage 1, prepared by TMS, dated 6th September 2023
CD 1.41 Statement of Community Involvement, prepared by Enso Energy, dated October 2022
CD 1.42 Winter Bird Survey Report 2022-2023, prepared by Avian, dated 27th June 2023